SandyConcrete Contractor
Call NowFree Quote
New concrete driveway at a new home

Utah County · Free quotes

Concrete in Highland, UT

Concrete in Highland planned around grade and drainage. Phone us or use the form to start a free quote.

Sandy Concrete Contractor · Highland and Utah County

Highland Slope and Slab Quote

Describe what you want built or repaired, a rough size and how the yard slopes. A phone call follows to discuss the grade and plan a visit to the property.

  • Free quotes
  • Sloped and bench lots
  • Drainage planned first
  • Homes and businesses

A sentence about the slope helps. Quotes are free.

Rather talk? Call (801) 210-6285

Highland, Utah

Concrete for Highland slopes and level lots

Homeowners in Highland call about a basement they want to open to the yard, a slope they want to turn into flat space, a driveway that pools water at the garage, or a walk that has sunk and cracked. Each of those is a drainage question as much as a concrete question.

Before an excavator touches a hillside, a call to 811 brings Blue Stakes of Utah out to mark buried utilities, and on a slope those marks also show where lines cross the planned cut. On a sloped lot, runoff from the yards above has to go somewhere, so every slab, wall and walkout is planned with a path for that water before anyone discusses the finish.

For a free quote in Highland, call or send the form and include a line about the slope and any wet spots. Expect a phone call to go over the grade and set a time to walk the property together.

Bright lower-level basement room with a glass door leading out to the yard

Utah County, Utah

Around Highland

Quotes in Highland are handled alongside Cedar Hills, Alpine and American Fork, with each lot judged on its own slope, soil and drainage before any concrete is planned.

Lots up on the east-side benches and foothills often sit on gravelly alluvial ground or old lake shorelines, and some of that ground can settle once soaked, which is why water is kept out from under slabs.

Neighbors in Cedar Hills, Alpine, American Fork and Lehi get the same grade-and-drainage approach as Highland homeowners.

Examples

Walkouts, walls and slabs on sloped lots

  • Concrete slab with cracks and settled sections
  • A crack and offset across a concrete slab
  • Cracked concrete that needs repair

Stock photos: examples of the work type.

Questions

Highland FAQs

Can you build a walkout basement on my Highland lot?

Most homes with a basement can get one, though the work varies with the grade. A lot that falls away needs less digging, while a flat lot needs a stairwell with walls on both sides. Either way, plan on a header over the new door, a building permit, and in most cases a letter from an engineer.

When does a retaining wall in Highland need an engineer?

Usually once it stands taller than about 4 feet, or when a driveway, a building or more slope sits above it and adds weight. The city's building department sets the exact threshold, so the requirement is confirmed before the design is final.

How far down do footings need to go in Highland?

Deep enough to sit under the frost, which for most valley lots means around 30 inches. Homes higher on the benches or close to a canyon mouth may need deeper footings, and the local building department names the exact figure.

Why is water pooling against my slab or foundation in Highland?

Usually because the slab has settled or tipped toward the house, or because runoff from uphill has no path around it. Lifting or replacing the slab to restore its slope, and adding a drain or extending downspouts, typically solves it.

How do I request a concrete quote in Highland?

Call (801) 210-6285 or use the form with the project, the rough size and a note about the slope or any drainage trouble. You will get a call to discuss it and arrange a time to see the lot, and the quote costs nothing.

Will my project need a permit, an engineer or HOA sign-off?

Walkouts nearly always do, since sawing a doorway into a foundation wall means installing a header, and building departments usually ask for an engineer's letter describing it. A retaining wall tends to cross into engineered territory past roughly 4 feet, or sooner when a driveway, a building or more hillside bears down on it from above. Driveway approaches need a city permit, many HOAs want to see plans first, and nobody digs until 811 has had the utilities marked.

Get a Free Quote in Highland

A few sentences about the project and how the lot falls are enough to begin a free quote.