SandyConcrete Contractor
Call NowFree Quote
Wide broom-finished concrete patio with lawn chairs facing a large backyard and two-story home

Utah County · Free quotes

Concrete in Lehi, UT

Sloped yard or sunken slab in Lehi? Get a free quote from Sandy Concrete Contractor.

Sandy Concrete Contractor · Lehi and Utah County

Price Your Project in Lehi

Describe what you want built or repaired, a rough size and how the yard slopes. A phone call follows to discuss the grade and plan a visit to the property.

  • Free quotes
  • Sloped and bench lots
  • Drainage planned first
  • Homes and businesses

A sentence about the slope helps. Quotes are free.

Rather talk? Call (801) 210-6285

Lehi, Utah

Concrete for Lehi slopes and level lots

From central Sandy, Lehi lies about 11 miles to the south, and it shares the same winters, snowmelt and mountain sun. Whether a lot sits flat or climbs toward a view, we look at the grade, the soil and the drainage before planning a slab, a wall or a walkout.

On a sloped lot, runoff from the yards above has to go somewhere, so every slab, wall and walkout is planned with a path for that water before anyone discusses the finish. Lots up on the east-side benches and foothills often sit on gravelly alluvial ground or old lake shorelines, and some of that ground can settle once soaked, which is why water is kept out from under slabs.

Send a short description of your Lehi project, plus photos of the slope if you have them. A call back follows to discuss grade and drainage and arrange a visit, and the quote is free.

Breaking out old concrete with a jackhammer

Utah County, Utah

Around Lehi

From streets close to Lehi Main Street Historic District, Wines Park and Margaret Wines Park to the edges of Lehi, hillside and level yards alike get the same start: grade measured, drainage planned, base and footings set for frost.

Footings for walls, steps and walkouts have to sit beneath frost depth, roughly 30 inches for much of the valley, and lots up on the high benches near the canyons can need deeper ones.

Near Lehi, we also quote walkouts, walls and flatwork in Highland, American Fork, Bluffdale and Saratoga Springs.

Examples

Walkouts, walls and slabs on sloped lots

  • New concrete driveway at a new home
  • Wide concrete driveway leading to a dark two-car garage door
  • Long concrete driveway with control joints leading to a two-story home

Stock photos: examples of the work type.

Questions

Lehi FAQs

Can you build a walkout basement on my Lehi lot?

Most homes with a basement can get one, though the work varies with the grade. A lot that falls away needs less digging, while a flat lot needs a stairwell with walls on both sides. Either way, plan on a header over the new door, a building permit, and in most cases a letter from an engineer.

When does a retaining wall in Lehi need an engineer?

Usually once it stands taller than about 4 feet, or when a driveway, a building or more slope sits above it and adds weight. The city's building department sets the exact threshold, so the requirement is confirmed before the design is final.

How far down do footings need to go in Lehi?

Deep enough to sit under the frost, which for most valley lots means around 30 inches. Homes higher on the benches or close to a canyon mouth may need deeper footings, and the local building department names the exact figure.

Why is water pooling against my slab or foundation in Lehi?

Usually because the slab has settled or tipped toward the house, or because runoff from uphill has no path around it. Lifting or replacing the slab to restore its slope, and adding a drain or extending downspouts, typically solves it.

How do I request a concrete quote in Lehi?

Call (801) 210-6285 or use the form with the project, the rough size and a note about the slope or any drainage trouble. You will get a call to discuss it and arrange a time to see the lot, and the quote costs nothing.

Will my project need a permit, an engineer or HOA sign-off?

Walkouts nearly always do, since sawing a doorway into a foundation wall means installing a header, and building departments usually ask for an engineer's letter describing it. A retaining wall tends to cross into engineered territory past roughly 4 feet, or sooner when a driveway, a building or more hillside bears down on it from above. Driveway approaches need a city permit, many HOAs want to see plans first, and nobody digs until 811 has had the utilities marked.

Get a Free Quote in Lehi

A few sentences about the project and how the lot falls are enough to begin a free quote.