SandyConcrete Contractor
Call NowFree Quote
Finished walkout basement with sliding glass doors opening onto the backyard

Walkouts · Sandy Concrete Contractor

Walkout Basement Contractor in Sandy, UT

Open a below-grade basement to the yard with a new door and stairwell. Ask for a free quote.

Sandy, Draper, Cottonwood Heights, Midvale, Alpine, South Jordan and 30 more towns

Free Walkout Quote

Describe what you want built or repaired, a rough size and how the yard slopes. A phone call follows to discuss the grade and plan a visit to the property.

  • Free quotes
  • Sloped and bench lots
  • Drainage planned first
  • Homes and businesses

A sentence about the slope helps. Quotes are free.

Rather talk? Call (801) 210-6285

Walkout Basements

Walkout Basement Contractor in Sandy, UT

A walkout turns a basement with window wells into one with a door to the yard, and that changes how the whole lower level gets used. On a sloped lot the yard may already fall away far enough that only a short excavation is needed to reach the basement floor. On a flatter lot the walkout becomes a stairwell: a dug-out pit with concrete steps climbing to the yard between two retaining walls. Either way, the work starts at the foundation wall, where a new opening is cut and a header carries the load above it.

That cut is structural, so it is planned on paper first. A building permit is required in most cases, and an engineer's letter usually specifies the header and any reinforcement around the opening. The excavation follows, then footings for the walls and steps, set below the frost line. The most important detail sits at the very bottom: water that runs into a stairwell has nowhere to go but the door, so a drain at the low point is tied into the footing drain or another outlet. Walls, steps and the landing at the door come after that.

Stamped concrete patio under a raised deck with string lights and a staircase

What's included

What goes into walkout basements

  • 01

    Foundation cut and header

    A new opening saw-cut through the foundation wall, with a header to carry the load above.

  • 02

    Engineering and permit

    The engineer's letter and building permit in hand before any cutting starts.

  • 03

    Excavation and haul-off

    Digging out the stairwell or grading the yard down to basement level, with the spoils hauled away.

  • 04

    Footings below frost

    Footings for the walls, steps and landing set below frost depth.

  • 05

    Drainage at the bottom

    A drain at the low point, tied to the footing drain or another outlet, so water never reaches the door.

  • 06

    Walls, steps and landing

    Retaining walls on both sides, concrete steps up to the yard and a landing at the door.

Examples

Walkout Basements: examples of the work

  • Bright lower-level basement room with a glass door leading out to the yard
  • Poured concrete walls with rebar and timber forms on a large commercial build
  • Tall segmental concrete block retaining walls lining both sides of a paved path

Stock photos: examples of the work type.

How it works

Walkout Basements, step by step

  1. 1

    Engineer and permit

    Confirm the opening size, header and wall design, and obtain the building permit.

  2. 2

    Dig, then cut

    Excavate outside first, then saw-cut the opening and install the header.

  3. 3

    Footings, drain, walls

    Pour footings, set the drain at the low point and build the side walls.

  4. 4

    Steps and landing

    Pour the steps and landing, backfill, and grade so surface water heads away from the stairwell.

Questions

Walkout Basements questions

Can a walkout be built in winter?

Yes, walkout work is one of the projects that keeps going through the cold months. Excavation, footings and walls are protected with blankets and heat as needed, and concrete never goes onto frozen ground. The steps and landing are poured once conditions allow, and sometimes those wait for spring.

What drives the cost of a walkout basement?

How deep and how wide the excavation is, which depends on how much the lot already slopes. After that come the size of the opening and header, engineering and permit work, the height and length of the side walls, the drainage, and the steps and landing. A lot that falls away on its own can need far less digging than a flat one.

Does a walkout need a permit and an engineer?

Almost always. Sawing through a foundation wall changes how the house carries its weight, so building departments typically require a permit, and an engineer's letter usually sets the header and details. Retaining walls in the stairwell may also need an engineered design if they are tall. 811 marks buried lines before excavation.

Will a walkout let water into my basement?

Not if the drainage is built right. The stairwell or patio outside the door needs a drain at its low point with a real outlet, the landing should sit below the threshold with a slight fall away from it, and the grade around the tops of the walls should turn surface water aside. Most walkout leaks trace back to a missing or clogged drain.

What about the door and the inside finish?

The concrete side of a walkout is the cut, header, excavation, footings, walls, steps, landing and drainage. Full basement finishing is not part of this service, so plan the door and the interior work with whoever is handling them, and size the opening to that door early.

Free quotes on walkout basements

A few sentences about the project and how the lot falls are enough to begin a free quote.