SandyConcrete Contractor
Call NowFree Quote
Aerial view of a city spread across a valley with snow-capped mountains behind

Utah County · Free quotes

Concrete in Orem, UT

Concrete in Orem planned around grade and drainage. Phone us or use the form to start a free quote.

Sandy Concrete Contractor · Orem and Utah County

Price Your Project in Orem

Describe what you want built or repaired, a rough size and how the yard slopes. A phone call follows to discuss the grade and plan a visit to the property.

  • Free quotes
  • Sloped and bench lots
  • Drainage planned first
  • Homes and businesses

A sentence about the slope helps. Quotes are free.

Rather talk? Call (801) 210-6285

Orem, Utah

Walls, walkouts and slabs in Orem

Properties in Orem range from level lots to ones with a real tilt, and concrete plans change a lot between the two. Sandy Concrete Contractor quotes driveways, patios, walkouts, retaining walls, stamped surfaces and repairs here, starting with how the ground falls and where the water goes.

Lots up on the east-side benches and foothills often sit on gravelly alluvial ground or old lake shorelines, and some of that ground can settle once soaked, which is why water is kept out from under slabs. Footings for walls, steps and walkouts have to sit beneath frost depth, roughly 30 inches for much of the valley, and lots up on the high benches near the canyons can need deeper ones.

Thinking about a walkout, a wall or new flatwork in Orem? Reach out by phone or form, and you will get a call to go over the lot and schedule a look in person for a free quote.

A crack and offset across a concrete slab

Utah County, Utah

Around Orem

Around Orem Community Hospital and Timpanogos Regional Hospital, Orem homeowners ask about flat space for a patio, a walkout to the yard or a driveway that sheds water, and each answer begins with the lay of the land.

A wall that retains more than about 4 feet of soil, or carries a driveway, house or slope on its uphill side, is the kind a city building department may want engineered and permitted.

Neighbors in Vineyard, Lindon, Provo and Pleasant Grove get the same grade-and-drainage approach as Orem homeowners.

Examples

Walkouts, walls and slabs on sloped lots

  • Fan-pattern stamped concrete texture
  • Colored slate-pattern stamped concrete
  • Exposed aggregate concrete surface

Stock photos: examples of the work type.

Questions

Orem FAQs

Can you build a walkout basement on my Orem lot?

Most homes with a basement can get one, though the work varies with the grade. A lot that falls away needs less digging, while a flat lot needs a stairwell with walls on both sides. Either way, plan on a header over the new door, a building permit, and in most cases a letter from an engineer.

When does a retaining wall in Orem need an engineer?

Usually once it stands taller than about 4 feet, or when a driveway, a building or more slope sits above it and adds weight. The city's building department sets the exact threshold, so the requirement is confirmed before the design is final.

How far down do footings need to go in Orem?

Deep enough to sit under the frost, which for most valley lots means around 30 inches. Homes higher on the benches or close to a canyon mouth may need deeper footings, and the local building department names the exact figure.

Why is water pooling against my slab or foundation in Orem?

Usually because the slab has settled or tipped toward the house, or because runoff from uphill has no path around it. Lifting or replacing the slab to restore its slope, and adding a drain or extending downspouts, typically solves it.

How do I request a concrete quote in Orem?

Call (801) 210-6285 or use the form with the project, the rough size and a note about the slope or any drainage trouble. You will get a call to discuss it and arrange a time to see the lot, and the quote costs nothing.

How do Utah winters affect concrete on a sloped lot?

Slopes concentrate the problem. Snowmelt runs downhill, gathers at the low edge of a slab or against a wall, and freezes again overnight, dozens of times a season. Air-entrained concrete, footings below frost depth (about 30 inches in most of the valley, sometimes more on high benches), steady drainage and no de-icing salt on new work the first winter keep that cycle from prying things apart.

Get a Free Quote in Orem

A few sentences about the project and how the lot falls are enough to begin a free quote.