SandyConcrete Contractor
Call NowFree Quote
Wide broom-finished concrete patio with lawn chairs facing a large backyard and two-story home

Patios · Sandy Concrete Contractor

Concrete Patio Contractor in Sandy, UT

Patios that turn a tilted backyard into flat, usable ground with a view. Ask for a free quote.

Sandy, Draper, Cottonwood Heights, Midvale, Alpine, South Jordan and 30 more towns

Free Patio Quote

Describe what you want built or repaired, a rough size and how the yard slopes. A phone call follows to discuss the grade and plan a visit to the property.

  • Free quotes
  • Sloped and bench lots
  • Drainage planned first
  • Homes and businesses

A sentence about the slope helps. Quotes are free.

Rather talk? Call (801) 210-6285

Patios

Concrete Patio Contractor in Sandy, UT

On a sloped backyard, the hard part of a patio is making flat ground. There are three ways to get it. You can cut into the hill and hold the uphill side back with a wall. You can build up the downhill side with compacted fill behind a wall. Or you can do a bit of both, which often moves the least dirt. The right choice depends on how steep the yard is, where the view opens up, how the patio meets the door, and how far you are willing to step down to reach the lawn.

Once the patio is flat, it still has to drain. The surface typically pitches away from the house, roughly a quarter inch over each foot, and on a hillside you also plan for water arriving from above: a shallow swale or drain along the uphill side keeps runoff from crossing the slab. A patio built on fill depends on that fill being compacted in thin lifts, because fill dumped in one pass will settle, and the slab will follow it down. Outside a walkout door, the patio doubles as the landing, so its height is set by the threshold.

Stamped concrete patio under a raised deck with string lights and a staircase

What's included

What goes into concrete patios

  • 01

    Cut, fill or terrace plan

    Choosing how to make flat ground with the least digging and the best view.

  • 02

    Retaining walls where needed

    Walls to hold back the uphill side or support a raised patio edge.

  • 03

    Fill compacted in lifts

    Fill spread in thin lifts, each one run over with a compactor, so the slab does not sink later.

  • 04

    Uphill drainage

    A swale, low curb or drain that stops runoff from crossing the patio.

  • 05

    Reinforced slab

    Typically 4 inches thick, with steel set at mid-depth and an air-entrained mix.

  • 06

    Finish options

    Broom, stamped or colored, with traction kept in mind near steps and slopes.

Examples

Patios: examples of the work

  • Concrete patio beneath a wooden deck with a bistro table and a view of the backyard
  • Colored concrete patio with a white wrought iron table, chairs and potted plants
  • Concrete patio with a black metal bench and planters beside a painted brick home
  • Covered concrete patio with an outdoor kitchen beside a white modern home
  • Backyard pool with a concrete deck
  • Pool deck between the house and the lawn

Stock photos: examples of the work type.

How it works

Patios, step by step

  1. 1

    Pick the level

    Set the patio height relative to the door, the yard and the view.

  2. 2

    Move the dirt

    Excavate the uphill side or place and compact fill, building any walls first.

  3. 3

    Drain and base

    Install drains and the gravel base, then form the slab with its pitch away from the house.

  4. 4

    Pour and cure

    Place, finish and joint the slab, and keep heavy furniture off it for the first few days.

Questions

Patios questions

Will a patio on a slope settle or crack?

Not if the ground beneath it is handled properly. Undisturbed soil on the cut side is usually firm, but fill on the downhill side has to be compacted in thin layers, and certain bench soils slump once they are saturated, so water has to stay out from under the slab. Air-entrained concrete and planned joints handle the freeze-thaw on top.

What affects the cost of a patio on a sloped yard?

Mostly the dirt work and walls it takes to create flat ground, then the size and finish of the slab. Access matters a great deal on hillside lots, since the truck often cannot reach the backyard and the concrete has to be pumped. Drains and any engineering for taller walls round it out.

Is a permit needed for a raised or terraced patio?

A slab on grade often does not, but the walls that hold a terraced patio up can need engineering and a permit once they pass about 4 feet or carry a slope above. A patio at a walkout door may be tied into permitted walkout work. HOAs may want to see plans, and buried lines get marked through 811 before digging.

Should the patio sit at the main floor or the walkout level?

It depends on how you live. A walkout-level patio is simpler to build and keeps the slab on firm ground, while a patio off the main floor needs a lot of fill or a tall wall to reach. Many hillside homes end up with the patio down at the walkout level and the view enjoyed from the main floor above it.

How do you keep water off a patio on a hillside?

By catching it before it arrives. A shallow swale, a low curb or a drain along the uphill edge diverts runoff around the slab, and the slab itself pitches away from the house toward an outlet. Downspouts are piped past the patio rather than emptied onto it.

Free quotes on patios

A few sentences about the project and how the lot falls are enough to begin a free quote.